150,000 UNITS A MONTH

Product Capability

A WEEK to TWO MONTHS OUT THE DOOR

Across 80+ production lines we run standard models, modified builds and ground-up new tooling under one roof. This page answers the two questions every buyer asks — can you handle my volume, and how soon do I get my goods — then lets you self-locate your order on the lead-time ladder.

dbb-factory
Can you handle my volume?

DiBiBi Monthly Capacity — Standard Performance Data

We build to order — no goods sit on a shelf. Every order takes a slot in the production queue; smaller standard runs clear fastest. Peak output assumes standard models on continuous run; mixed schedules reduce throughput.

Monthly Output

15K

units / month, peak-rated Injuries

Production Lines

100%

running in parallel

Standard Runrate

3000

units / week per model

HOW SOON DO YOU DO YOUR PRODUCTS?

DiBiBi Production Lead Time

Lead time steps up with distance from ready tooling. Find the tier your order falls into — the bar shows the relative wait; the trigger line tells you what pushes an order into that tier.

 

5–7 workdays25%
25%

Trigger: a modest standard-series order — roughly 500 units or fewer, existing model and spec. It slots straight into the queue and clears fast, no full-scale run needed.

Standard Product

existing model

7–15 workdays35%
35%

Trigger: existing model, existing mold, existing color and spec. No changes — we just run it through the line.

Modified Product

existing model, changed

15–35 workdays55%
55%

Trigger: an existing model with changes — different color, added hardware, minor dimension tweak. Needs mold/setup adjustment, not new tooling.

Custom Outdoor Sructures

built to your spec

35–55 workdays75%
75%

Trigger: built to your requirements — size, layout, branding — on our existing process capability, but nothing pre-made. A full production cycle from scratch.

New Product Development

new SKU

55-70 workdays90%
90%

Trigger: a genuinely new SKU — new mold tooling, sampling, then testing & validation before mass production. Mold-making alone runs weeks before the first unit.

DiBiBi Product Lines

FAQs

No — everything is built to order. Each order takes a slot in the production queue, so your lead time depends on the tier your order falls into and the current queue, not on shelf availability.

A modest standard-series order — around 500 units or fewer of an existing model — typically clears in 5–7 workdays once it enters the queue.

Around 150,000 units a month across 80+ lines — roughly 3,000 units per week on a single standard model running continuously. Larger accounts are scheduled across multiple lines.

When your specs are confirmed we place the order in line and give you a firm production slot. Higher tiers (modified, custom, new tooling) add setup or mold time before the run begins.

A new SKU needs new mold tooling, sampling and validation before mass production can start. Mold-making alone runs weeks before the first unit is produced.

Located your tier? Send the specs.

Tell us the model, quantity and any changes. We’ll place it on the ladder and come back with a firm date and price.